The scope of work included conversion of four secondary settling tanks into four biological reactors at the Wastewater Treatment Plant in Siesławice, Poland;
conversion of a biological reactor into a storage reservoir V = 4000m3.
2450 m3 of concrete was poured: mostly arc walls (RONDA), pillars and balconies.
Approximately 124 tons of steel was reinforced.